Abstract
Energy codes across the country are progressively getting stricter and increasing the threshold for a baseline building’s energy performance. California’s Title 24 Energy Code is pushing towards net-zero energy for all new construction residential buildings by 2020, and all new construction commercial buildings by 2030. This makes it increasingly important for architects and engineers to collaborate to ensure that the architectural intent of a building can be maintained while meeting energy code.
Typically, architects create models early on to orient the building massing and layout. Once the general building design has been solidified, engineers and energy analysts will be brought on board to assess more detailed design options. While these energy models can impact the HVAC system design, glazing selections, and window performance, it is often too late to improve upon or adjust the overall building massing or envelope design. This can lead to missed opportunities to optimize the overall building design.
Using Hollywood & Gower, a high rise residential project, as an example, this paper discusses how architects and engineers can work together in the conceptual and entitlement phases (a pre-development phase whereby The City grants development rights to a specific parcel) to optimize a building’s design and ensure the design intent can meet California’s strict energy code. The architects, began by running a parametric energy analysis for various external shading options. This helped to understand the effectiveness of various shading devices to reduce solar heat gains. Energy analysts then used the architectural geometry to build an energy compliance model to assess the impacts of the shading strategies compared to Title 24 energy code. This process allowed for the team to understand the effect of design decisions on Title 24 energy code compliance.
This paper will showcase the Hollywood & Gower integrated work flow, how this dynamic can be applied to other projects, how design can be as aesthetically sophisticated as it is performative and how it can be expanded in the future.
Authors
Keywords
Introduction
Green building design is continuously evolving to require a more holistic approach, especially with ever escalating concerns about Climate Change, rising CO2 levels, and progressive energy code cycles. California’s Title
Access Restricted
Background
The Hollywood & Gower high rise residential project is currently in the entitlement phase of its project life. HKS started the design process with conceptual ideas that maximized views and
Access Restricted
Method
Using Hollywood & Gower, a high-rise residential project, as an example, this paper discusses how architects and engineers should work together in the conceptual and entitlement phases to optimize a
Access Restricted
Explanation
The Honeybee and CBECC-Com models both show the same narrative, that an increase in window-to-wall ratio has a decrease in performance due to the increase in cooling loads. From this
Access Restricted
Conclusion and Future Work
Because the architect worked hand in hand with both the initial energy modeler and the compliance energy modeler every step of the external shading structure was analyzed. Performing these iterative
Access Restricted
Acknowledgements
Thank you to Brian Stern and Jacob Chan for their help with the analysis and report.
Rights and Permissions
The American Institute of Architects. “The Carbon Neutral Design Project: What is Carbon Neutral Design?” http://www.tboake.com/carbon-a... (accessed August 25, 2017).
Architecture 2030. “The 2030 Challenge”
http://architecture2030.org/20... (accessed August 12, 2017).
Ladybug Tools
www.ladybug.tools